Core themes
USV Operational Readiness Review
A structured check of whether the vessel, the people and the paperwork are ready to go to sea and stay there.
Services / Core themes
A remote operations centre is an operating model, not a room with screens. Most of the cost and nearly all of the risk sits in the parts you cannot buy: who is on watch, what they are allowed to decide, what happens at handover, and what the room does when the link drops.
A specification you can build or fit out against, sized to the tier you actually chose. The operating documents that make it a control centre rather than an office: role descriptions, watch and handover procedure, escalation matrix, standing orders. And a continuity plan with a fallback position that has been thought through rather than assumed.
Either a fixed piece of work with an agreed output, or embedded support through design, fit-out and first operations.
This covers new centres, a second centre in another country, and existing rooms that have quietly grown past the model they were built for. The third case is the most common.
Core themes
A structured check of whether the vessel, the people and the paperwork are ready to go to sea and stay there.
Core themes
The approval case, the flag and class route, and the conversations with ports and authorities that decide whether you operate.
Core themes
Getting a vessel, a team and a shore base into a new port and operating safely, on schedule.
Tell me what you have and what you are trying to get to. A paragraph is plenty.